Banner
Home Residents Business Government Rec and Tourism Online Services Search
Search:
 
In This Section


Water & Sewer Rates





Public Utilities: Water & Sewer Rates

Water & Sewer Rates

Water and Irrigation (Effective July 1, 2010)

Size of Meter
Minimum Charge
Charge per 1,000 gals. 9,001 to 18,000 gals. total water consumption*
Charge per 1,000 gals. 18,001 to 27,000 gals. total water consumption
Charge per 1,000 gals. over 27,001 gals. total water consumption
5/8" & 3/4"
$52.39
$5.24
$5.71
$5.98
1"
$97.98
$5.24
$5.71
$5.98
1 1/2"
$206.45
$5.24
$5.71
$5.98
2"
$310.26
$5.24
$5.71
$5.98
3"
$541.21
$5.24
$5.71
$5.98
4"
$866.64
$5.24
$5.71
$5.98
6"
$1,732.10
$5.24
$5.71
$5.98
8" - 10"
$3,096.19
$5.24
$5.71
$5.98
Number of billings per year: 4
Irrigation Meter Installation Charges:
Irrigation meter -- Construction and installation: $750.00
Irrigation meter--Installation only: $300.00
*Total water consumption is the sum of the domestic water reading and the irrigation meter reading(if applicable)


Sewer (Effective July 1, 2010)

Size of Meter Minimum Charge
Charge per 1,000 gals 9,000 to 18,000 gals.
Charge per 1,000 gals. 18,000 to 27,000 gals.

Charge per 1,000 gals. over 27,000

5/8" & 3/4"
$72.77
$7.28
$7.88
$8.31
1"
$171.46
$7.28
$7.88
$8.31
1 1/2"
$334.76
$7.28
$7.88
$8.31
2"
$579.70
$7.28
$7.88
$8.31
3"
$1,159.40
$7.28
$7.88
$8.31
4"
$1,884.90
$7.28
$7.88
$8.31
6"
$3,857.28
$7.28
$7.88
$8.31
8" -10"
$7,908.19
$7.28
$7.88
$8.31

Connection Charges (Effective July 1, 2010)

Size of Meter
Water
Sewer
Sewer Connection Availability *
5/8" and 3/4"
$4,300 $8,600 $4,700
1"
$7,125 $12,850 $7,225
1 1/2"
$14,275 $25,700 $14,150
2"
$24,675 $44,275 $24,750
3"
$48,575 $88,550 $45,500
4"
$78,575 $144,300 $78,375
6"
$161,400 $295,700 $141,425
8" - 10"
$331,400 $605,700 $247,475

* Sewer Connection Availability fees are due for all equivalent residential units (ERUS) in a development at the time of Planned Unit Development approval, the time of subdivision plat approval, or the time of individual connection, whichever comes first. Fees may be deferred by written agreement with The County to be paid in five equal annual installments with the first installment due at time of approval.

Plan Review/Inspection Fees (Effective July 1, 2006)
Plan Review Fees: $0.25 per LF of main line pipe

 

Construction Inspection Fees: Water Sewer  
  $1.00 $1.50 Per LF of main line pipe

GIS As-Built Fees (Effective July 1, 2007)
$0.70 Per LF of main line pipe

Domestic Meter Installation Fees (Effective July 1, 2007)
Size of Meter
Fee
5/8"
$300.00
3/4"
$365.00
1"
$380.00
1 1/2"
$580.00
2"
$750.00
3" and above
Per supplier invoice

back to top